View Single Post
Old 12-07-2007, 10:07 PM   #4
I-Hate-Hulse
Franchise Player
 
I-Hate-Hulse's Avatar
 
Join Date: Jul 2003
Location: Sector 7-G
Exp:
Default

Hmmm good point... this is 1/2 basement where half of it is above ground, so I don't think I need to worry about ground water too much. Then again... this is Kensington. Was it hard to mix concrete, or was it a simple mix from Home Depot?

I'm laying a subfloor for warmth, and to level the place out. I'd have gone with the plastic cleated tiles they have now but I didn't tear out all the old sub floor from the last owner and am just redoing the bathroom area.
I-Hate-Hulse is offline   Reply With Quote