Quote:
Originally Posted by I-Hate-Hulse
Not sure if this was mentioned before but the pathway on the northside of the Bow River was closed between the Peace Bridge and the 10th St Bridge today.
|
Correct, that is for warranty work on the concrete done on that section of the pathway. Apparently they tried some new stuff when they did it and the work was covered for the damage/wear that it underwent.